UDK-01 and UDK-02 – Drammen

UDK-01 and UDK-02 – Drammen Client: ÖSTU-STETTIN Periode: 2021-2023 Country: Norway Equipment supplied: Equipment supplied: 1x Invert Formwork, 2x Rebar Gantry and 2x Arch Formworks
Railway Tunnel Divaca – Koper

Railway Tunnel Divaca – Koper Client: Kolektor CPG d.o.o. Periode: 2023-2025 Country: Slovenia Equipment supplied: 1x Rebar Gantry with a Platform for the Reinforcement, 2x Arch Formworks All machines are equipped with the latest technologies fully hydraulic with Non-rail-based drive units ÖSTU-STETTIN Pumping ports Hydraulic controlled pressure rod system and hydraulic controlled conical pins for […]
Power Station Obervellach II

Power Station Obervellach II Client: ARGE KW Obervellach II Periode: 2021-2023 Country: Austria Equipment supplied: Headrace Tunnel: 1x Fullround Formwork Storage Tunnel: 1x Rebar Gantry, 1x Arch Formwork Access Tunnel: 1x Arch Formwork
Pumped-storage Hydropower Plant Limberg III

Pumped-storage Hydropower Plant Limberg III Client: ARGE PSW Limberg III Periode: 2022-2025 Country: Austria Equipment supplied: Headrace Tunnel: 2x Arch Formwork Intake Tunnel: 1x Arch Formwork Tailwater Tunnel 1x Arch Formwork, 1x Service Gantry Penstock shaft: 1x Fullround Formwork Surge shaft: 1x Fullround Formwork
Deep Tunnel Sewerage System Phase 2

Deep Tunnel Sewerage System Phase 2 Client: Ed Züblin AG Periode: 2020-2023 Country: Singapore Equipment supplied: Link Sewer; 1x Invert Formwork, 1x M+E Gantry, 1x Gantry Crane 2x Arch Formworks (hit and miss) South Tunnel: 1x Invert Formwork, 1x M+E Gantry, 1x Gantry Crane 4x Arch Formworks (hit and miss) DTSS 2 constructed a 50 […]
Tunnel Trzcinsko – Tunnel Fachingen – Tunnel Cramberger

Tunnel Trzcinsko – Tunnel Fachingen – Tunnel Cramberger Client: PORR Tunnelbau Periode: 2023-2025 Country: Poland – Germany Equipment supplied: Under ongoing railway operations ÖSTU-STETTIN supplied 1 Rebar Gantry, 1x Arch formwork for widening the existing tunnel and 1x Service Gantry The Project was designed that with a minimum of modification works all Gantries can be […]
U2xU5 Rathaus – Frankplatz

U2xU5 Rathaus – Frankplatz Client: ARGE U2/22 x U5/2 – Rathaus / Frankplatz Periode: 2023-2025 Country: Austria – Vienna Equipment supplied: 1x Rebar Gantry with Pallet lifting Gantry, 1x Fullround Formwork for the main track For the Station 1x Invert Formwork 1x Rebar Gantry with Pallet lifting Gantry, and 1x Arch Formwork
Sydney Metro West – Cross Passage Formwork

Sydney Metro West – Cross Passage Formwork Client: Gamuda Australia Periode: 2023-2024 Country: Australia – Sydney Equipment supplied: full hydraulic system for a fast and easy setup, of the variable lengths of the Cross Passages Independent Carrier for quick positioning of Barrel and Collar Formwork.
SBT2.1 Semmering Basistunnel

SBT2.1 Semmering Basistunnel Client: ARGE Tunnel Fröschnitzgraben Periode: 2021-2025 Country: Austria Equipment supplied: Standard Cross Section SEM Tunnel :1x Rebar Gantry with Pallet lifting Gantry, 2x Arch Formworks Standard Cross Section continuous tunneling: 1x Rebar Gantry with Pallet lifting Gantry, 3x Arch Formworks Cross Passages and Collar Formworks, Flatbed Carrier to pass over for the […]
Flughafentunnel

Flughafentunnel Client: ARGE Flughafentunnel Periode: 2021-2024 Country: Germany Equipment supplied: 1 secondary lining train for the main track, Cross Passages and Collar Formworks, and Enlargement profiles.