Tunnel Trzcinsko – Tunnel Fachingen – Tunnel Cramberger

Client:

PORR Tunnelbau

Periode:

2023-2025

Country:

Poland – Germany

Equipment supplied:

  • Under ongoing railway operations ÖSTU-STETTIN supplied 1 Rebar

  • Gantry, 1x Arch formwork for widening the existing tunnel and 1x Service Gantry

    The Project was designed that with a minimum of modification works all Gantries can be used also for the Tunnel Fachingen and Tunnel Cramberger too.

    This special project shows the engineering achievement of ÖSTU-STETTIN Steel and Formwork Department ones again.