Railway Tunnel Divaca – Koper

Client:

Kolektor CPG d.o.o.

Periode:

2023-2025

Country:

Slovenia

Equipment supplied:

  • 1x Rebar Gantry with a Platform for the Reinforcement, 2x Arch Formworks

All machines are equipped with the latest technologies fully hydraulic with

  • Non-rail-based drive units
  • ÖSTU-STETTIN Pumping ports
  • Hydraulic controlled pressure rod system and hydraulic controlled conical pins for the bottom.