SBT2.1 Semmering Basistunnel

Client:

ARGE Tunnel Fröschnitzgraben

Periode:

2021-2025

Country:

Austria

Equipment supplied:

  • Standard Cross Section SEM Tunnel :1x Rebar Gantry with Pallet

  • lifting Gantry, 2x Arch Formworks

  • Standard Cross Section continuous tunneling: 1x Rebar Gantry with Pallet lifting Gantry, 3x Arch Formworks

  • Cross Passages and Collar Formworks, Flatbed Carrier to pass over for the machinery e.g. concrete mixer.

  • Invert Formwork with a total length of 120 Meter

All machines are equipped with the latest technologies fully hydraulic with

  • Non-rail-based drive units
  • ÖSTU-STETTIN Pumping ports
  • Hydraulic controlled pressure rod system and hydraulic controlled conical pins for the bottom.